ASIC process#

Follow the stages from reviewed RTL through implementation and signoff.

Overview#

The ASIC flow starts with reviewed RTL, then moves through synthesis, physical implementation, analysis, and signoff. Each stage should leave inputs, reports, and tool versions that can be reviewed later.

Stages#

Stage

Required context

Observable evidence

RTL readiness

Source, constraints, clocks, resets, and verification status

Diagnostics and an accepted baseline

Synthesis

Target libraries, constraints, and supported toolchain

Netlist, reports, warnings, and tool versions

Physical implementation

Floorplan, placement, clock, routing, and process inputs

Stage reports, artifacts, and constraint results

Analysis

Timing, power, area, congestion, integrity, and reliability inputs

Reviewable metrics, violations, and methodology

Signoff

Foundry rules, corners, tools, and acceptance criteria

Reproducible signoff reports or an explicit incomplete state

How it works#

Altifigence products organize project inputs, run tools available on the selected machine or runner, and keep reports and artifacts together for review.

Incomplete Stages#

If a tool, licence, process input, or signoff check is missing, the stage remains incomplete. Do not replace a missing report with an estimated pass.